On this site we have completed various drylining works for Coel Cambridge.
Job location: Batim House, East Road, Cambridge.
Works included:
- 864 m2 of ceiling linings
- 47 m2 of Gypliner ceilings
- 170 m2 of 400mm thick insulation
- Approximately 1000 m2 of tape & joint
- Various bulkheads and boxings
- Timber, MDF & plasterboard wall linings to overboard glazing wall sections
- Shower wall linings
- Fire rated corridor walls
- Access panels & loft hatches